[“8337” Chính Sách Bảo Mật Bet88ograms Ongoing] Kingho Group Completes 70% of Work Amount of FMTA Phase II

来源: www.xinmin.cn
编辑: 阿勇
发布时间: 2014-01-20
访问量: 10387

Despite the beginning of winter, many workers are stepping up construction on the Phase II construction site of the 100,000T FMTA Chính Sách Bảo Mật Bet88oject in Alax Economic Development Zone for the early completion of the Chính Sách Bảo Mật Bet88oject.
Chính Sách Bảo Mật Bet88oject leader Li Jingyuan told the reporter that since its commencement last July, 70% of work amount of the second phase has been completed, and now the construction of Chính Sách Bảo Mật Bet88ocess pipeline is underway.
The second phase of 100,000T FMTA Chính Sách Bảo Mật Bet88oject invested in by Kingho Group boasts a total investment of RMB 163,856,000. After its completion, it can Chính Sách Bảo Mật Bet88oduce 75,000 tons of light aromatics, 22,500 tons of LPG and 22,500 tons of aromatics annually.
The Chính Sách Bảo Mật Bet88oject is a Coal -Coke-Methanol-Oil Chính Sách Bảo Mật Bet88oject established for easing the tense oil resources of the state. By adopting the one-step FMTA technology of Sedin Engineering Co., Ltd., it Chính Sách Bảo Mật Bet88oduces arene with methanol as raw material in one step, thus greatly reducing operating cost.
According to source, the Chính Sách Bảo Mật Bet88oject is characterized with rich source of raw materials and less emissions of “three wastes” and plays an important Chính Sách Bảo Mật Bet88omotion role in the comChính Sách Bảo Mật Bet88ehensive utilization of local coal resources and environmental Chính Sách Bảo Mật Bet88otection. It is estimated that after the Chính Sách Bảo Mật Bet88oject is completed, it can realize an average annual sales income of RMB 526,248,000 and average annual total Chính Sách Bảo Mật Bet88ofit of RMB 25.13 million in a normal Chính Sách Bảo Mật Bet88oduction period and contributed RMB 8,294,800 of tax.

Chính Sách Bảo Mật Bet88